Determination of rutting on the highway. Requirements for evenness of road surfaces

Determination of rutting on the highway. Requirements for evenness of road surfaces

25.07.2019

Measurements of track parameters during the diagnostic process are performed in accordance with the Methodology for measuring and assessing the operational condition of roads by track depth, approved by order of the Ministry of Transport of Russia on May 17, 2002 No. OS-441-r.

Measurements are made along the right outer runway in the forward and reverse directions in areas where, with visual inspection the presence of a rut was established.
The number of measurement sites and the distance between the sites are taken depending on the length of the independent and measuring sections. A section is considered independent if, according to a visual assessment, the track parameters are approximately the same. The length of such a section can vary from 20 m to several kilometers. An independent section is divided into measuring sections with a length of 100 m each.
At each measuring section, five measurement sections are allocated at an equal distance from one another (on a hundred-meter section every 20 m), which are assigned numbers from 1 to 5. In this case, the last section of the previous measuring section becomes the first section of the next one and has the number 5/1.

The rail is laid on the protrusions of the outer track, then, with an accuracy of 1 mm, one reading is taken at the point corresponding to the largest depth of the track in each alignment, using a measuring probe installed vertically. In the absence of extrusion, the rail is laid on carriageway so that the measured track overlaps.
If there is a pavement defect in the measurement site (pothole, crack, etc.), the measurement site can be moved forward or backward up to 0.5 m to eliminate the influence of this defect on the read parameter.
The track depth measured in each alignment is recorded in the statement.

Estimated speed, km/h Track depth, mm
admissible maximum allowable

More

120
Andless

Table 10.3

For each measuring section, the estimated track depth is determined. To do this, analyze the results of measurements in five sections of the measuring section, discard the largest value, and the value of the track depth following it in the descending row is taken as the calculated value for this measuring section (hKH).
The calculated rut depth for an independent section is determined as the arithmetic mean of all values ​​of the calculated rut depth in the measuring sections:

The assessment of the operational state of roads in terms of track depth is carried out for each independent section i by comparing the average estimated track depth h k.s. with allowable and maximum allowable values ​​(Table 10.3).
Sections of roads with a rut depth greater than the maximum allowed values are classified as dangerous for vehicle traffic and require immediate work to eliminate the track.

Do not drive on our roads, it is sometimes scary to walk, there is a chance to stumble or slip on a rut that reaches up to ten centimeters in some places, although according to GOST it should not be at all. This is how car owners beat their expensive cars, mother our roads. Today our interview with the state inspector of road supervision Ilya Polukhin.

How many accidents are due to poor road surfaces?

- Since the beginning of the year, there have been 195 accidents, of which only one was due to defects in the road surface.

– Just one? We have terrible roads and not to say that all drivers do not comply speed mode. After all, just yesterday there was an accident in front of the "Spark", probably because of the track.

- I think that there are accidents due to the track, but the fundamental one is still traffic violation by the drivers themselves, for example, failure to provide an advantage to a car that moves along main road. Often accidents occur for a reason when the driver passes in reverse, at the same time, he is not convinced of the safety of his maneuver, and also our drivers violate the speed limit. The driver is driving, he sees that it is snowing, ice, ruts, but he does not slow down, but drives as he likes.

- What rutting is permissible according to GOST? You look - on the streets of our city, especially on Sverdlov, there are very deep ruts.

- According to GOST, there should be no rutting at all. The GOST says that the pavement of the roadway should not have subsidence, potholes, and other damage that impedes movement. Vehicle. The maximum dimensions of individual drawdowns and potholes should not exceed 15 centimeters in length, 60 centimeters in width and 5 centimeters in depth. Nothing was said about rutting.

- Did you issue instructions from the UGKh to eliminate violations?

- Last year, the traffic police of the city of Kachkanar, together with the traffic police for the Sverdlovsk region, examined the roads of the Kachkanar urban district, as a result of the survey, ruts were identified. In the name of the head of the city, an order was issued to eliminate the rutting of the road surface on Oktyabrskaya and Sverdlov streets.

- But nothing has been fixed, as there was a track, so it remained.

- Indeed, the track has not been eliminated, but temporarily installed road sign"rough road" on Oktyabrskaya street and near Mebelny.

- Who, except the mayor, received orders for bad roads?

– Instructions are received by persons responsible for the maintenance of roads in the city

How much were they fined for non-compliance?

– Fines were issued in accordance with the sanctions under articles Administrative Code RF.

– Is it convenient for you, as a driver, to drive on our roads?

- No. It seems to me that any driver will say that he feels sorry for his car.

- And what is wrong?

– Roads should be cleaned down to asphalt, but, unfortunately, this does not happen in our country.

The conclusion suggests itself, do not want to beat your cars, bought for a lot of money, walk, or drive along all Kachkanar roads at 20 km / h. Otherwise, while you wait until the officials find the money and are going to correct all the instructions, you can stay without a car.

  • 4.6. Measurement and evaluation of the longitudinal evenness and grip properties of the road surface
  • 4.10. Determination of the state of engineering equipment and road construction
  • 4.11. Determination of the intensity and composition of traffic flows
  • 5. METHODOLOGY FOR ASSESSING THE TRANSPORT AND OPERATIONAL CONDITION OF ROADS
    • 5.2. Assessment of the transport and operational condition of the highway
    • 5.3. Assessment of the transport and operational state of the road network
    • 5.4. The procedure and methodology for assessing the influence of elements of parameters and characteristics of roads on a comprehensive indicator of their transport and operational condition
    • 5.5. Determination of the indicator of engineering equipment and arrangement
    • 5.6. Determination of the indicator of the level of operational maintenance of the highway
    • 5.7. Summary results of the assessment of the technical level and operational condition of roads
  • 6. FORMATION OF INFORMATION BANK OF DATA ON THE STATE OF ROADS
  • 7. PLANNING ROAD REPAIR WORK BASED ON THE RESULTS OF DIAGNOSIS AND ASSESSMENT OF THE CONDITION OF ROADS
    • 7.1. Planning the types and scope of work based on the analysis of the actual state of roads
    • 7.2. Planning of work according to the criterion of ensuring the estimated speed of movement, transport effect and economic efficiency
    • 7.3. Repair planning based on "compliance indices"
    • 7.4. General principles for the formation of programs for the repair and reconstruction of roads based on the results of diagnostics and assessment of their condition
  • 8. EXAMPLE OF ASSESSING THE TRANSPORT AND OPERATIONAL CONDITION OF ROADS AND PLANNING ROAD REPAIR WORKS
    • 8.2. Processing of the received information to determine the complex indicator of the transport and operational state of the road section
    • 8.3. Processing the received information to determine the generalized indicator of the quality of the road section
    • 8.4. Assignment of types and sequence of road repair work with full funding
    • 8.5. Assignment of types and priority of road repair works using the ODDR 7 program
  • 9. APPS
    • Annex 9.1. PROCEDURE FOR DETERMINING THE AVERAGE SPEED OF THE TRAFFIC STREAM
    • Annex 9.2. STANDARDS FOR THE VOLUME OF WORK AND THE FREQUENCY OF DIAGNOSTICS AND SURVEYS OF HIGHWAYS
    • Annex 9.3. LINE SCHEDULE FOR ASSESSING THE TRANSPORT AND OPERATIONAL CONDITION OF THE ROAD
  • Active Edition from 03.10.2002

    Document name"RULES FOR DIAGNOSTICS AND ASSESSMENT OF THE CONDITION OF HIGHWAYS. MAIN PROVISIONS. ODN 218.0.006-2002" (approved by Order of the Ministry of Transport of the Russian Federation dated 03.10.2002 N IS-840-r)
    Document typerules, order
    Host bodyMinistry of Transport of the Russian Federation
    Document NumberIS-840-R
    Acceptance date01.01.1970
    Revision date03.10.2002
    Date of registration in the Ministry of Justice01.01.1970
    Statusvalid
    Publication
    • At the time of inclusion in the database, the document was not published
    NavigatorNotes

    "RULES FOR DIAGNOSTICS AND ASSESSMENT OF THE CONDITION OF HIGHWAYS. MAIN PROVISIONS. ODN 218.0.006-2002" (approved by Order of the Ministry of Transport of the Russian Federation dated 03.10.2002 N IS-840-r)

    4.7. Measuring and evaluating pavement rutting

    4.7.1. Measurements of track parameters during the diagnostic process are performed in accordance with the ODM "Methodology for measuring and assessing the operational state of roads by track depth" according to a simplified version using a 2-meter rail and a measuring probe.

    Measurements are made along the right outer runway in the forward and reverse directions in areas where the presence of a track is established during visual inspection.

    4.7.2. The number of measurement sites and the distance between the sites are taken depending on the length of the independent and measuring sections. A section is considered independent if, according to a visual assessment, the track parameters are approximately the same. The length of such a section can vary from 20 m to several kilometers. An independent section is divided into measuring sections with a length of 100 m each.

    If total length independent section is not equal to the whole number of measuring sections of 100 m each, an additional shortened measuring section is allocated. A shortened measuring section is also assigned if the length of the entire independent section is less than 100 m.

    4.7.3. At each measuring section, 5 measurement sections are allocated at an equal distance from one another (on a 100-meter section every 20 m), which are assigned numbers from 1 to 5. In this case, the last section of the previous measurement section becomes the first section of the next one and has the number 5 / 1.

    The shortened measuring section is also divided into 5 sections, located at an equal distance from one another.

    4.7.4. The rail is laid on the protrusions of the outer track and one reading h_k is taken at the point corresponding to the largest depth of the track in each alignment, using a measuring probe installed vertically, with an accuracy of 1 mm; in the absence of bulges, the rail is laid on the carriageway in such a way as to block the measured track.

    If there is a coating defect in the measurement section (pothole, crack, etc.), the measurement section can be moved forward or backward up to 0.5 m in order to eliminate the effect of this defect on the read parameter.

    4.7.5. The track depth measured in each alignment is recorded in the statement, the form of which with an example of filling is given in Table 4.9.

    Table 4.9

    TRACK DEPTH MEASUREMENT SHEET

    Independent site numberBinding to mileage and lengthMeasuring section length l,mDepth of rut on alignmentsEstimated track depth h_kn, mmAverage estimated track depth h_ks, mm
    line numbertrack depth h_k, mm
    1 from km 20+150 to km 20+380, L = 230 m100 1 11 13
    2 8
    3 12
    4 17
    5/1 13
    100 2 16 13 12,7
    3 10
    4 13
    5/1 11
    30 2 9 12
    3 14
    4 12
    5 7

    For each measuring section, the estimated track depth is determined. To do this, analyze the results of measurements in 5 sections of the measuring section, discard the largest value, and the value of the rut depth following it in the descending row is taken as calculated at this measuring section (h_KN).

    4.7.6. The calculated rut depth for an independent section is determined as the arithmetic mean of all values ​​of the calculated rut depth in the measuring sections:

    , mm. (4.1)

    4.7.7. The assessment of the operational state of roads in terms of track depth is carried out for each independent section by comparing the average estimated track depth h_KS with the allowable and maximum allowable values ​​(Table 4.10).

    Table 4.10

    Scale for assessing the condition of roads by track parameters measured using a simplified method

    Estimated speed, km/hTrack depth, mm
    admissiblemaximum allowable
    >120 4 20
    120 7 20
    100 12 20
    80 25 30
    60 and under30 35

    Road sections with a rut depth greater than the maximum allowable values ​​are considered dangerous for vehicle traffic and require immediate work to eliminate the rut.

    On the obligation to eliminate rutting on the road section

    Case no.

    Accepted Nikolaevsky District Court (Ulyanovsk Region)

    1. Nikolaevsky District Court of the Ulyanovsk Region, consisting of:
    2. presiding judge Agafonov S.N.,
    3. with the participation of the prosecutor of the Pavlovsky district of the Ulyanovsk region Beznosikov I.P.,
    4. under Secretary Fadeeva L.V.,
    5. having considered in open court a civil case on the claim of the prosecutor of the Pavlovsky district of the Ulyanovsk region in defense of the rights and legitimate interests of an indefinite circle of persons against the administration of the municipality "Pavlovsk urban settlement", LLC "Pavlovkastroyremont" on imposing the obligation to eliminate the rut on the road section along the street. Kalinin in r.p. Pavlovka to the substation in the direction of the village of Evleika, Pavlovsky district, Ulyanovsk region,
    6. Installed:

    7. The prosecutor of the Pavlovsky district of the Ulyanovsk region, in defense of the rights and legitimate interests of an indefinite circle of persons, filed the above-mentioned claim with the court, indicating that an audit conducted by the prosecutor's office of the Pavlovsky district in the activities of the administration of the municipality "Pavlovsk urban settlement" revealed violations of the law regulating legal relations in the field of organization of road activities.
    8. Thus, in accordance with clause 5 of the Federal Law No. 131-FZ of October 6, 2003 “On general principles local government organizations in Russian Federation» issues of local importance of the settlement include road activity in relation to motor roads of local importance within the boundaries of settlements, as well as the exercise of other powers in the field of the use of motor roads and the implementation of road activities in accordance with the legislation of the Russian Federation.
    9. According to the Federal Law of December 10, 1995 No. 196-FZ “On the Security traffic» local governments, in accordance with the legislation of the Russian Federation and the legislation of the constituent entities of the Russian Federation, within their competence, independently resolve issues of ensuring road safety.
    10. In accordance with Part 2 of Article 12 of the Federal Law “On Road Safety”, the obligation to ensure that the condition of roads during their maintenance established rules, standards, technical standards and others regulatory documents assigned to the persons involved in the maintenance of highways.
    11. At the same time, as the audit showed, the administration of the municipality "Pavlovsk urban settlement" and LLC "Pavlovkastroyremont" work on cleaning local roads within the municipality "Pavlovsk urban settlement" is carried out improperly.
    12. In particular, on st. Kalinin in r.p. Pavlovka on the section of the road from the store "Kumir" to the substation has a rut height of 10 to 15 cm.
    13. However, in accordance with section 3 of the state standard of the Russian Federation “Roads and streets. Requirements for the operational state, admissible under the terms of ensuring road safety. GOST R 50597-93 ”(hereinafter - GOST R 50597-93), approved by the Decree of the State Standard of the Russian Federation dated 10/11/1993 No. 221, the carriageway of roads and streets must be clean, without foreign objects that are not related to their arrangement.
    14. As follows from the explanations of the deputy head of the administration of the MO "Pavlovsk urban settlement" FULL NAME2, the rut on Lenina street in the village. Pavlovka on the section of the road from the Kumir store to the substation was formed as a result of weather conditions including heavy snowfall.
    15. Currently, the cleaning of local roads belonging to the municipality "Pavlovsk urban settlement" in accordance with the municipal contract No. dd.MM.YYYY is carried out by LLC "Pavlovkastroyremont".
    16. From the explanations of the director of the above enterprise FULL NAME3, it follows that Pavlovkastroyremont LLC DD.MM.YYYY in the administration of the Pavlovsk urban settlement municipality concluded a municipal contract No., according to which the enterprise assumes obligations to clean roads on the territory of the municipality Pavlovsk urban settlement , including on the street. Kalinin in the village of Pavlovka from the Kumir store to the substation. Rutting has formed on this section of the road due to unfavorable weather conditions and untimely snow removal.
    17. According to Table 4.10 of the Rules for the Diagnostics and Assessment of the Condition of Highways, approved by the Decree of the Ministry of Transport of Russia dated 03.10.2002 No. IS-840-r, at an estimated vehicle speed of 60 km/h or less, the allowable and maximum allowable gauges should be 30 and 35 mm. respectively.
    18. Sections of roads with a rut depth greater than the maximum permissible values ​​are considered dangerous for vehicle traffic and require immediate work to eliminate them.
    19. The fact of the presence of rutting on the street. Kalinin in r.p. Pavlovka on the road section from the Kumir store to the substation is confirmed by an act of identified deficiencies in road maintenance dated February 16, 2011, drawn up by the head of the OGIBDD ATS for the Pavlovsky District, FULL NAME6
    20. Violation of the requirements for the operational condition of a section of a local road on the street. Kalinin in r.p. Pavlovka is one of the reasons committed in January 2011 in this area of ​​traffic accidents.
    21. Thus, the presence of rutting on the above section of the road can lead to an accident and, as a result, harm to the health of citizens, the circle of which is not possible to determine.
    22. In accordance with the Code of Civil Procedure of the Russian Federation, the prosecutor has the right to apply to the court with a statement in defense of the rights and legitimate interests of an indefinite circle of persons.
    23. At the hearing, the prosecutor of the Pavlovsky district Beznosikov AND.P. requirement to the administration of the municipality "Pavlovsk urban settlement", LLC "Pavlovkastroyremont" to impose the obligation to eliminate rutting on the road section along the street. Kalinin in r.p. Pavlovka to the substation in the direction of the village of Evleika, Pavlovsky district, Ulyanovsk region, supported in full, citing the arguments set out in the statement of claim.
    24. The representative of the defendant - administration MO «Pavlovsk urban settlement» Kurashova L.M. I disagree with the claim, at the hearing I explained that the rut on the section of the road along Kalinin Street in the village. Pavlovka to the substation in the direction of the village of Evleika was formed as a result of weather conditions, heavy snowfall, then there were very coldy. Although the road was being cleaned, the equipment could not cope and rutting was formed. Previously, this section of the road was served by the DRSU, and this year they were cleaning federal roads. On February 21, 2011, Pavlovkastroyremont LLC submitted an act of work performed and they were transferred cash. On February 28, 2011, the AMO conducted a survey of this road section and the director of Pavlovkastroyremont LLC was recommended to properly comply with the terms of the municipal contract. Currently, rutting on the road section along the street. Kalinin in the village of Pavlovka to the substation in the direction of the village of Evleika has been eliminated, about which there is a corresponding act.
    25. The defendant's representative, Pavlovkastroyremont LLC, duly notified of the place and time of the case, did not appear at the hearing, and did not report the reasons for the failure to appear to the court.
    26. Representative of a third party - OGIBDD ATS for MO "Pavlovsky District" Nasyrov M.M. at the hearing explained that rutting on the road section on the street. Kalinin in the village of Pavlovka to the substation in the direction of the village of Evleika is still available, and the condition of the road does not meet the requirements of GOST R 50597-93.
    27. The court, after listening to the explanations of the parties, examining the materials of the case, comes to the following.
    28. In accordance with the Code of Civil Procedure of the Russian Federation, each party must prove the circumstances to which it refers as the basis for its claims and objections, unless otherwise provided by federal law.
    29. RF "On Road Safety" determines that the repair and maintenance of roads in the Russian Federation must ensure road safety. Compliance of road conditions with rules, standards, technical norms and other regulatory documents related to ensuring road safety is certified by acts control examinations or road surveys conducted with the participation of the relevant executive authorities. The obligation to ensure that the condition of roads during their maintenance complies with the established rules, standards, technical norms and other regulatory documents rests with the persons involved in the maintenance of roads.
    30. According to the law "On highways and road activities in the Russian Federation” dated 10/18/2007, the powers of local governments in the field of the use of roads and the implementation of road activities include monitoring the safety of local roads (part 1, article 13 of the Law).
    31. Article 14 of this Law provides that road planning is carried out by the authorized state authorities of the Russian Federation, state authorities of the constituent entities of the Russian Federation, local governments on the basis of territorial planning documents, the preparation and approval of which are carried out in accordance with the Town Planning Code of the Russian Federation, financial cost standards on overhaul, repair, maintenance of roads and assessment of the transport and operational condition of roads, long-term target programs.
    32. Part 3 Art. 15 of the Law also provides that the implementation of road activities in relation to local roads is provided by authorized bodies of local self-government.
    33. In accordance with Art. 17 of the Federal Law “On highways and road activities in the Russian Federation”, the maintenance of roads is carried out in accordance with the requirements technical regulations in order to maintain the uninterrupted movement of vehicles on roads and safe conditions such traffic, as well as ensuring the safety of roads. The procedure for the maintenance of motor roads is established by regulatory legal acts of the Russian Federation, regulatory legal acts of the constituent entities of the Russian Federation and municipal legal acts.
    34. In accordance with paragraph 5 of Art. 14 No. 131 of 06.10.2003 “On the General Principles of Organizing Local Self-Government in the Russian Federation”, local issues of a settlement include road activities in relation to local roads within the boundaries of settlements, as well as the exercise of other powers in the field of the use of roads and the implementation road activities in accordance with the legislation of the Russian Federation.
    35. In accordance with section 3 of the State Standard of the Russian Federation “Roads and streets. Requirements for the operational state, admissible under the terms of ensuring road safety. GOST R 50597-93 ”(hereinafter - GOST R 50597-93), approved by the Decree of the State Standard of the Russian Federation dated 10/11/1993 No. 221, the carriageway of roads and streets must be clean, without foreign objects that are not related to their arrangement.
    36. According to Table 4.10 of the Rules for the Diagnostics and Assessment of the Condition of Highways, approved by Order of the Ministry of Transport of Russia dated 03.10.2002 No. IS-840-r, at an estimated vehicle speed of 60 km/h or less, the allowable and maximum allowable gauges should be 30 and 35 mm. respectively.
    37. At the hearing found that the section of the road on the street. Kalinin in r.p. Pavlovka from the Kumir store to the substation towards the village of Evleika is covered with ice, there is a rut from 10 to 15 cm high.
    38. These circumstances were revealed objectively by the court when examining the carriageway in the indicated direction in the village. Pavlovka.
    39. According to the municipal contract No. DD.MM.YYYY, the Administration of the municipality "Pavlovsk urban settlement" and LLC "Pavlovkastroyremont" entered into this contract for cleaning roads from snow with sanding in the territory of the municipality "Pavlovsk urban settlement": r.p. Pavlovka, p. Evleika. The Contractor, Pavlovkastroyremont LLC, undertakes to start performing the specified works after signing the contract and to complete them within two days after the snowfalls in January-April 2011 (case sheet 20.)
    40. According to the act of identified deficiencies in the maintenance of roads dated February 16, 2011, the head of the OGIBDD ATS for MO "Pavlovsky District" FULL NAME6 found a rut from 10 to 30 cm high on a section of the road in the village. Pavlovka from the Kumir store to the substation (case 24).
    41. According to the Charter of the municipality "Pavlovsk urban settlement", the issues of the settlement include road activities in relation to local roads within the boundaries of settlements (case sheets 16-17).
    42. According to the act of inspection of the road section on the street. Kalinin in r.p. Pavlovka from the Kumir store to the substation in the direction to the village. Evleyka dated February 28, 2011, it was found that the employees of Pavlovkastroyremont LLC eliminated rutting in this section.
    43. According to the payment order No. DD.MM.YYYY, the administration of the Pavlovsk City Settlement Municipality transferred funds in the amount of 234,280 rubles 8 kopecks to Pavlovkastroyremont LLC for clearing roads from snow under the contract.
    44. Thus, having analyzed the evidence available in the case, the court concludes that there are ruts, ice and snow on the road section in the village. Pavlovka from the Kumir store to the substation in the direction to the village. Evleika.
    45. The presence on the carriageway of the track exceeding the limit allowable rate, as well as snow and ice, poses a threat to the life and health of road users.
    46. The arguments of the Respondent's representative that such conditions were formed as a result of unforeseen weather conditions cannot be taken into account by the court, since according to the above contract, the roads must be cleared within 2 days after snowfalls.
    47. With regard to the act submitted to the court on the elimination of rutting by Pavlovkastroyremont LLC on this section of the road, it does not correspond to the circumstances established at the hearing.
    48. Under such circumstances, the prosecutor's claim, filed in defense of an indefinite circle of persons, is justified and subject to satisfaction.
    49. Based on the foregoing and guided by

    Accepted and implemented

    Public service letter

    road infrastructure

    Ministry of Transport of the Russian Federation

    INDUSTRY ROAD GUIDELINE

    REPAIR AND MAINTENANCE OF ROADS

    COMMON USE

    (extract)

    1.2. Technical specifications and road characteristics

    1.2.1. The main parameters and characteristics that determine the transport and operational condition of the road are:

    Geometric parameters, which include the width of the carriageway, the edge reinforced and stopping lanes of roadsides, longitudinal slopes, radii of curves in plan and profile, slopes of bends and visibility distance;

    The strength of the pavement of the carriageway, the edge reinforcement and stopping lanes of the roadsides;

    Evenness and grip properties of the pavement of the carriageway, edge strengthening and stopping (reinforced with cohesive material) roadside lanes;

    Strength and stability of the subgrade and its elements;

    Integrity and performance of drainage and drainage structures;

    Availability and required condition of elements engineering equipment and road improvements.

    1.2.2. It is necessary that geometric parameters(curve radii, width of the carriageway and roadsides, dimensions of artificial structures) corresponded to the standards established for this category of road (road section). Deviations of the actual dimensions are allowed within the limits established by the relevant documents.

    1.2.3. Strength pavement on roads of I - IV categories are determined by the need for unhindered access to billing period cars with axial load up to 10 tf (100 kN), and on category V roads with hard surfaces up to 6 tf (60 kN).

    1.2.4. Coverings of the carriageway, edge strengthening and stopping strips of roadsides during operation must have longitudinal and transverse slopes provided for by the project, ensuring unhindered water flow.

    1.2.5. It is necessary that the edges of the pavement of the carriageway, edge reinforcing and reinforced stopping lanes of roadsides be even in plan, have regular and clear outlines, and not have destruction and deformation.

    1.2.6. During the operation of roads, it is necessary to ensure that the actual indicators of longitudinal evenness correspond to the maximum permissible values ​​given in Table 1.4.

    Table 1.4

    Intensity
    movement,
    bus/day

    Category-
    ria
    roads

    Type
    road
    clothes

    Maximum allowable
    longitudinal
    flatness, cm/km

    Permissible
    quantity
    gaps
    under
    3 meters
    lath,
    exceeding
    specified
    in SNiP
    3.06.03-85,
    %

    By
    device
    PKRS-2U

    according to the pusher
    THC-2,
    established
    by car

    GAZ-31022
    "Gazelle"

    Over 7000

    Capital

    3000 - 7000

    1000 - 3000

    Capital

    Lightweight

    1100

    500 - 1000

    Lightweight

    1200

    200 - 500

    Transition

    up to 200

    Lower

    1.2.7. Rutting should not be allowed on the pavement of the carriageway, in which dangerous conditions movement and interfere with the cleaning of coatings from snow deposits and the removal of winter slipperiness. Limits of permissible and maximum allowable depth ruts are established for two methods of measuring the depth of the rut using a two-meter rail: according to a simplified method, when the rail is laid on the surface of the coating or ridges of the uplift, and according to the method of vertical marks, when the reading is taken from the rail, brought to a horizontal position (Table 1.5).

    Table 1.5

    Estimated
    speed
    movement,
    km/h

    Track depth, mm

    Measurements by
    simplified methodology

    Measurements by the method of vertical marks

    Relative to the right
    exudate

    Relative to the left
    exudate

    Permissible

    Ultimately
    admissible

    Admit-
    May

    Ultimately
    admissible

    Admit-
    May

    Ultimately
    admissible

    Over 120

    not allowed-
    repents

    60 and
    less

    1.2.8. Rut removal works are carried out primarily on road sections with a depth greater than the maximum allowable values; On the surface of unreinforced roadsides and dividing strips that are not separated from the carriageway by curbs, it is not recommended to have ruts at the junction with carriageway and have a mark below its level by more than 3 cm with a traffic intensity above 6,000 vehicles brought to passenger car and more than 4 cm at lower intensity.

    1.2.9. The roughness and condition of the road surface of the carriageway must provide the required GOST 50597-93 wheel adhesion with the coating - at least 0.3 when measured by a tire without a tread pattern and 0.4 by a tire with a tread pattern.

    1.2.10. The difference in the coefficient of friction across the width of the carriageway is allowed no more than 0.1, the difference between the coefficient of adhesion of the pavement of the carriageway and the reinforced shoulder is 0.15.

    1.2.11. Potholes, breaks and subsidence with dimensions in length, width and depth of more than 15 x 60 x 5 cm are not allowed on the roadway surface, and the number is more than minor damage and defects in the spring-summer-autumn periods are less than the values ​​given in Table 1.6. The resulting deformations and destruction are eliminated within the time limits established by GOST 50597-93.

    Table 1.6

    Indicators
    states
    constructive
    road elements

    Permissible value for roads with traffic , auto/day, brought to a passenger car

    Over 6000

    2000 - 6000

    1000 - 2000

    200 - 1000

    Less than 200

    Damage (potholes) no larger than

    15*60*5 cm per m2 per 1000 m2 of coverage

    DRIVING ROAD

    (including used ramps)

    in the summer

    b) in spring

    b) in winter

    Individual open untreated cracks in the pavement with a width of > 5 mm p/m per 1000 m2

    Presence of untreated bitumen sweat spots,

    m2 per 1000 m2 of coverage

    Presence of streaks of pollution

    up to 0.5 m wide, area in %

    of the total coverage area no more

    No

    The presence of individual damage, subsidence and stagnant water on the roadsides and the median strip:

    LAND CLAD

    a) fortified

    up to 0.3

    - area m2 per 1000 m2 coverage
    (
    in the spring)

    1,5

    Depth (cm)

    up to 3.0

    up to 3.0

    up to 4.0

    up to 4.0

    up to 4.0

    b) unfortified

    - area m2 per 1000 m2 coverage

    5,0

    10,0

    12,0

    15,0

    Depth (cm)

    up to 3.0

    up to 3.0

    up to 4.0

    up to 4.0

    up to 4.0

    1.2.12. The condition of the pavement of the reinforcing lanes in terms of the presence of defects must comply with the requirements established for the pavement of the carriageway, and the condition of the fortified and unreinforced stopping lanes must comply with the requirements of Table. 1.6.

    1.2.13. Road shoulders are reinforced to provide structural strength and transverse slopes to facilitate rapid evacuation surface water.

    1.2.14. It is necessary that the slopes of embankments and excavations be resistant to the effects of climatic factors, ensure rapid drainage of surface water, and be strengthened in accordance with the provisions of the relevant documents. Slopes, especially deep cuts and high embankments, had a secure overall stability.

    1.2.15. Coverings of the carriageway and roadsides, dividing lanes and slopes, landing areas at bus stops, recreation areas, points of weight control and traffic accounting, and on sections of roads passing through settlements and the surface of sidewalks, pedestrian and bicycle paths should be kept clean, free from dust, dirt, foreign objects and materials.

    1.2.16. On the surface of unreinforced roadsides and the dividing strip, the presence of trees and shrubs and grass cover of more than 15 cm should not be allowed.

    1.2.17. In the right of way of roads passing in IV-V road-climatic zones, as well as on sections of roads passing through forests in other road-climatic zones, the presence of trees and shrubs is allowed, provided that the standard visibility is ensured.

    1.2.18. It is necessary that the system and devices for drainage, collection and removal of surface and ground water (drainage ditches, ditches, spillways, water wells, etc.) are constantly in working order and ensure effective water drainage from the road.

    Separate violations of the profile of drainage ditches along the length, reducing them throughput more than 20% are allowed in total up to 10% of the length of the surveyed section on roads of categories I - III and 20% on roads of categories IV - V.

    1.2.19. Unorganized (unauthorized) connections to roads of all categories are not allowed. It is allowed to have temporary technological exits on roads with an intensity of less than 1000 vehicles per day passing through agricultural land for the use of agricultural machinery, as well as on sections passing through forests for use in case of fires.