Machines and equipment for demolition of buildings. Special machinery and equipment for the destruction of buildings and structures

Machines and equipment for demolition of buildings. Special machinery and equipment for the destruction of buildings and structures

The company "ProgressAvtoStroy" offers the demolition of buildings and structures of any type in Moscow. We carry out, economic and, warehouses, hangars, old water towers, granaries. Without delay, we begin the demolition of structures of any size. We take on the basement, basement, underground tiers and communications.

We use the right one for work. The list of machines includes specialized equipment that helps to quickly dismantle buildings and structures, break and disassemble fragments, immediately load and.

Type of work

Industrial dismantling

Dismantling of factory buildings

negotiable

Dismantling of workshops

negotiable

Dismantling of machines and units

negotiable

Dismantling of industrial buildings

Pavilion dismantling

Dismantling of buildings from the foam block

Pipeline dismantling

Dismantling of the road slab

Dismantling of floor slabs

Dismantling of pipes and towers

Dismantling the water tower

Dismantling the water tower

Dismantling the chimney

Dismantling the chimney

Demolition of the brick tower

Construction of temporary roads

Dismantling: demolition of buildings and structures with dismantling

The fastest and cheapest way to dismantle a structure (except for laying charges to blow up buildings) is to use hits with a heavy object. For this, a special excavator with a rope suspension (dragline) is used, which strikes with a ball (the correct name is “woman”). The mass of the cargo reaches three tons, that is, the impact easily destroys structures.

Simultaneously with the impact method, it is possible to use other equipment for dismantling buildings:

  • for the demolition of small industrial structures, transformer booths, warehouses, sheds and private buildings. At the same time they are used for loading waste and. The bucket breaks the walls and ceilings of the structure, at the same time it can move construction debris to the side, load it onto a dump truck. The technique is used when it is necessary to dismantle structures 3-5 meters high, as well as to work with the foundation and the underground part of the building.
  • or special faucet. The technique is used for the destruction and crushing of structures, ensures accurate demolition and dismantling of the building. Depending on the capabilities of the machine, the tool rises to a height of up to 30-50 meters, that is, it can be used when demolition and dismantling of relatively tall buildings, residential buildings (for example, an apartment building) is needed.
  • Hydraulic shears, grinders, crushers. Attached dismantling tool that captures and destroys walls, metal structures, pipes, electrical wiring. The technique helps to carry out the dismantling of metal structures without the use of manual disassembly of the frame.
  • Debris removal grips. Grabs, buckets and special manipulators are not directly involved in the demolition - machines remove pieces of construction, construction waste, wall fragments, metal beams, pipes from the disassembly area.
  • Demolition support teams. Complex houses are partially dismantled by hand. Workers with cutters and grinders prepare metal structures and a demolished building for destruction, disassemble industrial equipment, help to load fragments of the structure - that is, they participate in almost all demolition processes.

How much does it cost to dismantle and demolish buildings and structures in Moscow and the Moscow Region

For each object for the demolition of buildings and structures, the price is calculated separately and depends on the location of the objects, the complexity of the work and the list additional services. The rates for work in the city and the region are almost the same, although they do not make it very convenient: difficulties with the delivery and placement of equipment sometimes make it necessary to involve compact and less productive machines in demolition, to use manual labor where a couple of dragline weights would be enough for dismantling.

To calculate the cost, contact a ProgressAvtoStroy specialist and provide the details of the task: characteristics of buildings, type of construction, distance to the nearest objects. The specialist will calculate how much the demolition and dismantling of the building costs.

Price for dismantling and demolition of industrial structures and buildings

Type of work

Industrial dismantling

Dismantling of factory buildings

negotiable

Dismantling of workshops

negotiable

Dismantling of machines and units

negotiable

Dismantling underground parking and parking

Dismantling of industrial buildings

Pavilion dismantling

Dismantling of buildings from the foam block

Pipeline dismantling

Dismantling of the road slab

Dismantling of a military unit, boarding house, sanatorium

Dismantling of floor slabs

Dismantling of the elevator, farm, cowshed

Dismantling of asphalt and porous concrete

Dismantling of pipes and towers

Dismantling the water tower

Dismantling the water tower

Dismantling the chimney

Dismantling the chimney

Demolition of the brick tower

Construction of temporary roads

Construction of a temporary road from slabs

Construction of a temporary gravel road

Construction of a temporary road from recycled materials

How to order the demolition and dismantling of buildings and structures

Call the dispatcher for clarification base prices, approximate dates performing work on . "ProgressAvtoStroy" is professionally engaged in dismantling, uses safe methods, carefully carries out the demolition and dismantling of the building: we select, act without delay and unnecessary noise. With a competent organization of the liquidation of the building, the demolition of structures will not even be noticed by Moscow - the main process (that is, the demolition itself, dismantling) takes from 1-2 hours to 2-3 shifts, garbage removal occurs in parallel. Call, call an engineer to assess the work or immediately order the demolition and dismantling of the building - we start fulfilling applications immediately after receiving: we are preparing for demolition, we quickly deliver equipment throughout Moscow and the region.

Manual methods of dismantling old, emergency buildings are giving way to mechanized methods, which use special equipment for the demolition of buildings. For Rostov-on-Don (with big amount dilapidated houses, high cost of land) dismantling works are relevant, but hampered by close urban development.

Equipment for the demolition of old buildings, other types of structures

Dismantling using explosive demolition methods is prohibited in Russian cities. The traditional demolition technique with a weight ( , ) gives a large number of fragments, can not cope with the dismantling of high-rise buildings, industrial structures.

Difficulty demolishing old buildings brick walls meter thickness, production shops with a metal frame. The main type of special equipment for dismantling was a demolition excavator. simple mechanisms with a short boom, a suspended metal ball, are used in the demolition of low-rise (up to three floors) buildings.

Excavators with extended (telescopic) boom, attachments(hydraulic hammer, hydraulic shears) are capable of destroying structures 20-25 meters high. A typical representative of special equipment is the Hyundai 320 destroyer. Crawler excavator with an eighteen-meter boom, it is capable of working with three-ton attachments. When equipped with a hydraulic hammer, the destroyer is successfully used for dismantling concrete, brick foundations with a depth of 10-15 meters. High-rise demolition excavators such as the Hitachi ZX-670 work at heights up to 40 meters.

Work with the same equipment demolition robots, supplied additionally with rotary cutters, non-impact concrete breakers. small dimensions, remote control, the absence of an operator allows the use of robots for dismantling in difficult, dangerous conditions.

TO additional equipment applied in dismantling works, relate front loaders(transporting waste from the dismantling site), dump trucks for the removal of debris, processing complexes, shredding construction waste on site. mobile crusher HARTL processes up to two hundred tons of concrete and brick waste per hour. Fractions of 130-500 mm allow up to 70% of recycled materials to be reused.

Contracts for the demolition of buildings

Special equipment for the demolition of residential buildings, industrial facilities is produced famous brands, Mercedes, Volvo, Liebherr, JCB, Metso Minerals, Crambo, Brokk, Hammel, Atlas Copco Krupp. There is no point in acquiring expensive equipment for one-time work, it is bought by large construction trusts, specialized companies. The dismantling of city buildings requires a separate project, precise planning, selection of optimal types of special equipment, and obtaining work permits.
An agreement with a company specialized in dismantling in the urban environment of Rostov-on-Don allows you to quickly, safely demolish a small private house, an old building, a production workshop. Reputable companies have a fleet of their own equipment that allows.

Building demolition methods are determined terms of reference, state of structures, technological conditions. This is the possibility of delicate disassembly by hand or quick demolition or explosives.

Price for dismantling and demolition of industrial structures and buildings

Type of work

Industrial dismantling

Dismantling of factory buildings

negotiable

Dismantling of workshops

negotiable

Dismantling of machines and units

negotiable

Dismantling of underground parking lots and car parks

Dismantling of industrial buildings

Pavilion dismantling

Dismantling of buildings from the foam block

Pipeline dismantling

Dismantling of the road slab

Dismantling of a military unit, boarding house, sanatorium

Dismantling of floor slabs

Dismantling of the elevator, farm, cowshed

Dismantling of asphalt and porous concrete

Dismantling of pipes and towers

Dismantling the water tower

Dismantling the water tower

Dismantling the chimney

Dismantling the chimney

Demolition of the brick tower

Construction of temporary roads

Construction of a temporary road from slabs

Construction of a temporary gravel road

Construction of a temporary road from recycled materials

Methods of dismantling, demolition of buildings, structures, metal structures

Organized and conducted in three ways:

  • complete or, commercial construction by hand with minimal use of heavy, mechanical devices;
  • attracting heavy special equipment, or hydraulic jets;
  • use of explosives.

The choice of dismantling method is determined by the specification of the structure, its condition, technical and technological feasibility. This implies conducting expert studies that provide recommendations regarding the choice of technology for the demolition of the building. Under certain conditions, methods can be combined.

Dismantling buildings manually

This method of dismantling structures is most often used for the demolition of small buildings with limited opportunities for the operation of equipment. Also, manual dismantling is used when it is necessary to save Construction Materials or disassemble only part of the building.

In such work on the dismantling of buildings, manual pneumatic tools are used.

Price for demolition and dismantling of houses depending on the area m2 (sq.m.)

Meters / rub.

The price includes only the dismantling of the house

Containers are paid separately as they are used (we order from the nearest landfill to you),

Foundation dismantling, considered separately, minimum order 10,000

Particular attention is paid to the safety of personnel. All specialists undergo targeted briefings, are provided with overalls and means personal protection. The territory adjacent to the building should also be prepared. This is the installation of fencing and warning signs about the danger. The building itself is disconnected from electricity, gas and water supply.

Attention!

Manual labor is widely used in the dismantling of metal structures. Here the coordinated work of equipment and workers is important. Such interaction can be provided by ProgressAvtoStroy professionals.

Demolition of buildings with the help of machinery

The use of equipment for the dismantling of buildings significantly speeds up the demolition process, but causes the formation of blockages from construction debris. To ensure the safety and speed of work, the waste must be promptly. Therefore, the demolition of buildings requires the use of a variety of techniques:

  • equipped with hydraulic shears or hydraulic hammer;
  • Rope, disk machines for the demolition of buildings;
  • frontal, bucket loaders;
  • truck cranes;

From the choice of equipment for the demolition of buildings, its functionality depends on the speed and safety of the work. The company "ProgressAvtoStroy" is able to solve technical problems of any complexity. Our experienced specialists will develop a rational project for the demolition of houses and other types of buildings, competently implement it.

Price demolition and dismantling of metal structures

Price demolition and dismantling of reinforced concrete structures and reinforced concrete objects

Type of work

Dismantling of reinforced concrete structures

Dismantling of reinforced concrete fence

Dismantling of concrete blocks

Dismantling of the reinforced concrete fence

Dismantling of reinforced concrete walls

Dismantling of reinforced concrete supports

Dismantling of concrete, reinforced concrete pipes

Dismantling of bridge structures

Bridge dismantling

Monolithic concrete structures of increased strength (dense reinforcement) such as bridge supports, tower crane foundations

If necessary, for the effective implementation of the tasks, along with the equipment, workers are involved in the disassembly. Often they perform an auxiliary function individual elements structures, coordinate the work of excavators, cranes, loaders of special vehicles.

Use of explosives

Explosives are used for the demolition of high, dimensional residential or industrial buildings. This technology is associated with a danger to life, property of people, requires the most accurate calculation of the power and location of the charge, therefore it is not used in dense urban areas. The difficulty of using explosives to demolish buildings is also subject to serious legal restrictions.

Differ high efficiency, the downside here is high level dustiness and the need for long-term analysis of rubble of construction debris.

Advantages of cooperation with ProgressAvtoStroy

We value every client, his time and material resources, so we approach problem solving professionally. For this, there is a staff of qualified specialists,. Reliability is ensured by strict technical control, the speed of information processing, the performance of work is guaranteed by modern logistics. Good faith implies the fulfillment of agreements in full.

The customer is guaranteed qualified information support, transparent pricing, loyal, flexible terms of interaction. Each item of expenditure is justified, each ruble of the client is invested in efficiency, accuracy, and safety. You can contact us to discuss the terms of cooperation by phone or via e-mail.

Renting a demolition excavator is currently a popular and relevant service, widely used in a large metropolis and its region.

What is this special equipment?

Specialized transport, with the help of which the safe dismantling and dismantling of buildings in emergency condition is carried out. This method of dismantling is appropriate only in cases where it is impossible to demolish a certain structure in another way. Bright to that disruption is an example.

Demolition excavator, rental and its features

This special equipment has the main working body, namely an arrow. The latter is driven by powerful hydraulic cylinders.

Advantages of renting special equipment from us

With the driver

Same day delivery

Fueled

Large selection of equipment

Verified

Favorable prices

Depending on the manufacturer, the described excavators can be supplied on tracks or wheels. In any case, the working booms of building demolition machines are an order of magnitude longer than standard working elements. Often they are represented by three sections instead of two sections characteristic of many specialized devices.



© 2023 globusks.ru - Car repair and maintenance for beginners