What is rutting. Rutting conditions and their effect on vehicle traffic

What is rutting. Rutting conditions and their effect on vehicle traffic

21.10.2019

What causes ruts on asphalt? Many motorists believe that the main reason is studded tires. Let's talk about the main points of the formation of ruts on highways. Who is guilty?

Main reasons

If you completely prohibit the operation of cars with studded tires, this will not eliminate the appearance of ruts on the roads. But why thorns are considered the main source, because there are other reasons. Tracks from studded tires are in the form of narrow strips. And from freight transport and a large flow of cars - in the form of deformation of the roadway. As a result, wide depressions appear on the roads, with elevated edges.

Namely, this type of track is most common. And the destruction from studded tires, compared with the deformation from a large flow of cars, is minimal.

It turns out that the important reasons for the appearance of the track are the imperfection of road construction works and the poor quality of the asphalt concrete mixture. According to the technical requirements, the roadway should consist of two layers, each of which must be left alone for three days. It often happens the other way around - the road builders will lay only one layer of asphalt, which is able to withstand the load of only 300 cars a day. And where can you find such roads in a large city with such low traffic?

In addition, when applying each layer of asphalt, it must be allowed to dry for 72 hours. In our country, everything is done the other way around, as soon as asphalt is laid, a stream of cars will immediately be allowed to pass through it. And who does not mind, from motorists, "fly" on the new smooth asphalt with a breeze.

Another reason for imperfection

When repairing an old road with deep ruts, only the top layer of asphalt is often removed, and a new one is applied in its place. This is certainly cheaper than building it again, but it's of little use. After a while, ruts form again.

When a rut is formed, the entire roadbed is deformed. To get rid of them, you need to rebuild the road anew, and not just replace the top layer. By the way, in Europe, the surface repair of the road, because. little sense from him.

It is clear that the main reason for the formation of a rut is the poor quality of the roadway and road works. Their contribution to the destruction of asphalt is minimal against the background of exposure to cold, heat, wind, heavy trucks. Of greater importance is the quality work of builders. If done correctly, a smooth and even road surface will delight drivers for decades. But, many motorists continue to argue that the spikes on the wheels are to blame. And often, they refer to the European experience.

Studded tires have been banned in Germany since 1975, but this has nothing to do with road destruction. The reason for the ban is a longer braking distance car with studded tires on dry pavement.

Can bad roads be redone?

The layout of the streets of large cities and the heavy workload will lead to the fact that during the overhaul, entire areas will be covered by a transport collapse. Cutting and replacing the upper damaged layer does not give the desired effect, because the deformation of the coating as a whole occurs, and not just the few centimeters removed. A year will pass, and the new surface will show the defects of the old one. For example, in Europe such a scheme is not applied. If the road needs repair, it is completely closed. It costs more, but the result is more profitable ...

When restoring damaged pavement, rough asphalt is used. It has a longer service life, which means it needs less repair. But the noise from it is above average. When repairing, bypass technologies are used when the top layer is laid from gravel. Motorists themselves must “roll it”. In practice, this turns around, in the first days after the repair, with the departure of stones from under the tires, which often leads to chips on the glass.

In order for the road to last longer, all construction technologies must be observed. But the spikes in the destruction of asphalt are definitely not to blame ... The track is the result of non-compliance with the laying technology.

  • 3.2. Requirements for ensuring the main consumer properties of roads
  • 3.3. Requirements for technical parameters and characteristics of roads
  • 3.4. Permissible dimensions, axle load and total vehicle weight
  • Section II changes in the state of roads during operation Chapter 4. The impact of vehicles and natural factors on the road and traffic conditions
  • 4.1. Interaction between car and road
  • 4.2. Impact of vehicle loads on pavement
  • 4.3. Influence of climate and weather on the condition of roads and driving conditions
  • 4.4. Zoning of the territory according to traffic conditions on the roads
  • 4.5. The impact of natural factors on the road
  • 4.6. Water-thermal regime of the subgrade during the operation of roads and its influence on the working conditions of pavements
  • 4.7. Pitfalls on highways and the reasons for their formation.
  • Chapter 5
  • 5.1. General patterns of changes in the state of roads during operation and their main causes
  • 5.2. Loading conditions and the main causes of subgrade deformations
  • 5.3. Main causes of pavement and pavement deformations
  • 5.4. Causes of cracks and pitting and their impact on the condition of the pavement
  • 5.5. Conditions for the formation of ruts and their influence on the movement of vehicles.
  • Chapter 6. Types of deformations and destruction of roads during operation
  • 6.1. Deformation and destruction of subgrade and drainage system
  • 6.2. Deformation and destruction of non-rigid pavement
  • 6.3. Deformations and destruction of cement concrete pavements
  • 6.4. Deterioration of road surfaces and its causes
  • Chapter 7
  • 7.1. The general nature of changes in the strength of pavements during operation
  • 7.2. The dynamics of changes in the evenness of road surfaces depending on the initial evenness and load
  • 7.3. Roughness and grip qualities of road surfaces
  • 7.4. Operability and criteria for assigning repairs
  • Section iii Monitoring the state of roads Chapter 8. Methods for determining the transport and operational indicators of roads
  • 8.1. Consumer properties as the main indicators of the state of the road
  • 8.2. Movement speed and methods for its determination
  • 8.3. Influence of parameters and road conditions on the speed of vehicles
  • 8.4. Assessment of the influence of climatic factors on the speed of movement
  • 8.5. Road capacity and traffic congestion levels
  • 8.6. Assessing the impact of road conditions on traffic safety
  • 8.7. Methods for identifying areas of concentration of road traffic accidents
  • Chapter 9. Methods for assessing the transport and operational condition of roads
  • 9.1. Classification of road condition assessment methods
  • 9.2. Determining the actual category of an existing road
  • 9.3. Methods for visual assessment of road conditions
  • 9.4. Methods for assessing the condition of roads by technical parameters and physical characteristics and combined methods
  • 9.5. Methodology for a comprehensive assessment of the quality and condition of roads according to their consumer properties
  • Chapter 10
  • 10.1. Purpose and tasks of road diagnostics. Organization of work on diagnostics
  • 10.2. Measurement of parameters of geometric elements of roads
  • 10.3. Measurement of pavement strength
  • 10.4. Measurement of longitudinal and transverse evenness of road surfaces
  • 10.5. Measurement of roughness and adhesive properties of coatings
  • 10.6. Determining the condition of the subgrade
  • Section IV system of measures for the maintenance and repair of roads and their planning Chapter 11. Classification and planning of works for the maintenance and repair of roads
  • 11.1. Basic principles for the classification of repair and maintenance work
  • 11.2. Classification of works on repair and maintenance of public roads
  • 11.3. Interrepair service life of pavement and coatings
  • 11.4. Features of planning work on the maintenance and repair of roads
  • 11.5. Road repair planning based on diagnostic results
  • 11.6. Planning of repair work, taking into account the conditions of their financing and using the feasibility study program
  • Chapter 12. Measures to organize and ensure traffic safety on the roads
  • 12.1. Methods of organizing and ensuring traffic safety on highways
  • 12.2. Ensuring evenness and roughness of road surfaces
  • 12.3. Improving the geometric parameters and characteristics of roads to improve traffic safety
  • 12.4. Ensuring traffic safety at intersections and on sections of roads in settlements. Road lighting
  • 12.5. Organization and ensuring traffic safety in difficult weather conditions
  • 12.6. Evaluation of the effectiveness of measures to improve traffic safety
  • Section V road maintenance technology Chapter 13. Road maintenance in spring, summer and autumn
  • 13.1. Maintenance of subgrade and right of way
  • 13.2 Maintenance of pavements
  • 13.3. Repair of cracks in asphalt concrete pavements
  • 13.4. Pothole repair of asphalt concrete and bituminous materials. The main methods of patching and technological operations
  • 13.5. Road dedusting
  • 13.6. Elements of road arrangement, means of organizing and ensuring traffic safety, their maintenance and repair
  • 13.7. Features of road maintenance in mountainous areas
  • 13.8. Fight against sand drifts
  • Chapter 14
  • 14.1. Classification of types of landscaping of roads
  • 14.2. Snow protection plantations
  • 14.3. Principles for the appointment and improvement of the main indicators of snow-retaining forest plantations
  • 14.4. Anti-erosion and noise-gas-dust protection landscaping
  • 14.5. decorative landscaping
  • 14.6. Technology of creation and maintenance of snow-protective forest plantations
  • Chapter 15
  • 15.1. Driving conditions on motor roads in winter and requirements for their maintenance
  • 15.2. Snow and snow-carrying roads. Zoning of the territory according to the difficulty of snow control on highways
  • 15.3. Protection of roads from snow drifts
  • 15.4. Clearing roads from snow
  • 15.5. Fight against winter slipperiness
  • 15.6. Ice and the fight against them
  • Section VI. Technology and means of mechanization of work on the maintenance and repair of roads Chapter 16. Repair of subgrade and drainage system
  • 16.1. The main types of work performed during the overhaul and repair of the subgrade and drainage system
  • 16.2. Preparatory work for the repair of subgrade and drainage
  • 16.3. Repair of roadsides and slopes of subgrade
  • 16.4. Repair of the drainage system
  • 16.5. Repair of heaving areas
  • 16.6. Widening of the subgrade and correction of the longitudinal profile
  • Chapter 17
  • 17.1. The sequence of work in the repair of pavement and coatings
  • 17.2. Construction of wear layers, protective and rough layers
  • 17.3. Regeneration of pavements and non-rigid pavements
  • 17.4. Maintenance and repair of cement concrete pavements
  • 17.5. Repair of gravel and crushed stone surfaces
  • 17.6. Strengthening and broadening of pavement
  • Chapter 18
  • 18.1. Assessment of the nature and identification of the causes of rutting
  • 18.2. Calculation and forecasting of the track depth and dynamics of its development
  • 18.3. Classification of methods for combating rutting on highways
  • 18.4. Elimination of ruts without eliminating or with partial elimination of the causes of rutting
  • 18.5. Methods for eliminating ruts with the elimination of the causes of rutting
  • 18.6. Measures to prevent the formation of ruts
  • Chapter 19. Machinery and equipment for the maintenance and repair of roads
  • 19.1. Vehicles for road maintenance in summer
  • 19.2. Winter maintenance machines and combined machines
  • 19.3. Machinery and equipment for road repair
  • 19.4. Floor marking machines
  • Section VII organizational and financial support for the operational maintenance of roads Chapter 20. Preservation of roads during operation
  • 20.1. Ensuring the safety of roads
  • 20.2. Procedure for seasonal traffic restrictions
  • 20.3. The procedure for passing oversized and heavy cargo
  • 20.4. Weight control on roads
  • 20.5. Fencing of road works and traffic organization
  • Chapter 21
  • 21.1. The procedure for technical accounting, inventory and certification of roads
  • Section 3 "Economic characteristics" reflects the data of economic surveys, surveys, traffic records, statistical and economic surveys.
  • 21.2. Accounting for traffic on roads
  • 21.3. Automated traffic data banks
  • Chapter 22
  • 22.1. Features and objectives of the organization of work on the maintenance and repair of roads
  • 22.2. Designing the organization of road maintenance works
  • 22.3. Road repair organization design
  • 22.4. Methods for optimizing design solutions for the maintenance and repair of roads
  • 22.5. Financing of works on repair and maintenance of roads
  • Chapter 23
  • 23.1. Principles and indicators of performance evaluation
  • 23.2. Forms of social efficiency of investments in road repair
  • 23.3. Accounting for Uncertainty and Risk in Assessing the Efficiency of Road Repairs
  • Chapter 24. Planning and analysis of the production and financial activities of road organizations for the maintenance and repair of roads
  • 24.1. Types, main tasks and regulatory framework for planning
  • 24.2. The content and procedure for the development of the main sections of the annual plan of activities of road organizations
  • 24.3. Economic analysis of the activities of road organizations
  • Bibliography
  • Chapter 18

    18.1. Assessment of the nature and identification of the causes of rutting

    Sections of roads with formed ruts are identified in the process of diagnosing the condition of the roads. At the same time, the depth of the track is measured and the degree of its influence on the speed and traffic safety is assessed, on the basis of which a fundamental decision is made on the need to eliminate it.

    Guided by the Classification of work on the repair and maintenance of roads, the type of repair is preliminarily assigned. In order to justify the type of repair and determine the scope and scope of work, it is necessary to identify the causes of rutting in each characteristic area. To do this, it is necessary to carry out detailed surveys of each section of the road on which repair work is planned.

    The track is formed as a result of heavy vehicle traffic at high air and pavement temperatures in summer and at high humidity of subgrade soils in spring; insufficient shear resistance of the layers of asphalt concrete pavement or base, as well as soils of the active zone of the subgrade. In this case, abrasion of the top layer of the coating in the rolling strip, additional compaction or reconsolidation of the pavement layers (with or without crushed stone destruction), peeling or chipping of the upper layer, plastic deformation of the pavement layers occur.

    The accumulation of residual deformations and structural damage can occur in one or several layers of the road structure at once. The top layer of the coating is located in the zone of maximum temperature effects and perceives the greatest load from the wheels of the vehicle. Therefore, it is subject to deformations to the greatest extent and more often than others is the cause of rutting. Any of the underlying layers can also be the cause of rutting.

    The track can be formed as a result of deformation of the transverse profile of the carriageway in the form of recesses along the rolling lanes with or without ridges. The total depth of the track is the sum of the height of the uplift and the depth of the depression (Fig. 18.1).

    Rice. 18.1. General view of the outer track: 1 - track base (bottom); 2 - a crest of a rut; 3 - design surface of the coating; IN To- track width; H To- total track depth ( H To =h y +h G);h G- height of the ridge; h y- depth of depression (recess); 4 - lane boundary; 5 - middle of one lane

    Field work on the survey of sections with a track is most expedient to be carried out in late summer or early autumn, after the cessation of high summer temperatures. Surveys must be completed at least 6-8 months before the start of the repair. Field surveys are carried out in two stages: visual surveys; instrumental examinations.

    A visual inspection of the site is carried out from a car moving at a speed of not more than 20 km / h or on foot. Stops are made in places that require detailed inspection and examination. Inspection of roads with separate carriageways is carried out in forward and reverse directions. At each site determine: the intensity and composition of traffic; coverage condition; roadside condition; condition of drainage structures and subgrade.

    The description of the external nature of the track is carried out according to the following criteria: general information; the shape and outline of the edges of the track (pronounced or smoothed); the presence of ridges of vypor and their nature; track depth (small - less than 20 mm, medium 20-40 mm, deep - more than 40 mm); track width; the presence of plastic deformations or signs of abrasion of materials; types of defects on the surface of the coating; heterogeneity of color and quantity of components on the surface (bitumen spots, lack of binder, protrusion of crushed stone, excess sand, etc.); track development dynamics (track develops quickly or slowly); the condition of the coating around the track (a network of cracks, sagging, peeling, etc.); picket position and length of the section with a track (beginning and end of the track), direction of movement and lane number.

    A preliminary conclusion on the condition of the road section and the reasons for the formation of a rut is made on the basis of the results of a visual inspection and general data. In conclusion, the planned methods for eliminating the rut are indicated. If the reason for the formation of a rut cannot be unequivocally established during a visual examination, instrumental examinations are prescribed, during which the following are established:

    geometrical parameters of the track (depth and width of the track, height and width of the ridges);

    geometrical parameters of the road (width of the carriageway, number of traffic lanes and width of each lane, shoulder width, longitudinal and transverse slopes);

    evenness of road surfaces;

    adhesion of coatings to a car wheel;

    pavement strength.

    The measurement of the geometric parameters of roads with a gauge by geodetic methods is used at the stage of survey and development of a technical project for road repair (if necessary, milling, leveling layers or widening of the roadway).

    In each diameter, 5 points are marked (Fig. 18.2): the edge of the carriageway on both sides TO 1 and K 2 middle of the carriageway WITH 1 and WITH 2 on each side; road axis O.

    Rice. 18.2. The layout of the control points on the surface: TO 1 and K 2 - the edge of the carriageway on each side; WITH 1 and WITH 2 - the middle of the carriageway on each side; 1 1 and 1 2 - the bottom of the right track in each lane; 2 1 and 2 2 - the top of the right track; O - axis of the road

    The geometric parameters of the road are measured every 10 m along the length of the road. On a road section with a track in the transverse profile, two additional points are obtained that characterize the depth of the track: the bottom of the track (point 1) and the top of the track (point 2). Measurements are carried out along the outer, right track (closer to the roadside) for each lane on which there is a track. The track depth is calculated as the difference between the marks of points 2 and 1.

    Elevation marks of additional points 1 and 2 are determined after 20 m, to link the track to the longitudinal and transverse profiles of the road and draw up a milling cartogram or leveling layers. If data on the track depth obtained by other methods are available, the track depth is measured by geodetic methods at least once for every 100 m. In the picket log, the coordinates of the beginning and end of the section with the track are noted.

    The assessment of the pavement strength is carried out on sections of the road with a track depth of more than 35 mm or in the presence of a grid of cracks, indicating a possible loss of strength by one or more layers of the pavement. Work is carried out according to the method ODN 218.1.052-2002 spring. To draw up the project, diagnostic data taken from the data bank obtained as a result of previous surveys of this site can be used. Examination of the pavement and pavement is carried out by sampling with rectangular cuttings measuring 300300 mm or by drilling cores with a diameter of 100 mm. It is most advisable to drill samples using a special drilling rig. A breakdown is considered at least two core samples taken at a distance of not more than 0.5 m from one another (two cores - one sample).

    Sampling is carried out in order to determine the cause of rutting in the pavement (search for a weak layer) and to assess the possibility of recycling materials.

    The sampling depth depends on the type and nature of the track:

    with a surface character of the track, the core sampling depth is assigned equal to the thickness of the asphalt concrete layers in the pavement;

    with a deep gauge, the core sampling depth is assigned equal to the thickness of the entire pavement. In this case, it is necessary to take soil samples from the active zone of the subgrade.

    Recommended sampling locations in one lane are shown in fig. 18.3. Point 1 is located at the bottom of the outer track (closer to the roadside) approximately in the middle of the outer track. Point 2 is 0.2-0.3 m away from the road axis or from the line dividing the traffic lanes. Point 3 is located at the top of the upstream ridge. Point 3 is optional. Regardless of the type of track, in each characteristic section, one control sample is taken from point 1 for the entire thickness of the pavement.

    Rice. 18.3. Scheme of sampling from the pavement: 1, 2, 3 - places (points) of sampling located in the same alignment, on the same lane

    With the surface nature of the track, samples are taken from points 1 and 2. Point 1 is located at the bottom of the outer track, and point 2 is removed from the axis of the road or from the line dividing the traffic lanes by 0.2-0.3 m. ) it is necessary to take two samples (4 cores). The maximum distance between sampling sites along the length of the road is no more than 500 m.

    In case of a deep rut, accompanied by extrusion of material from the layer with the formation of upstream ridges, an additional core sample is taken at the highest point of the rut - point 3 (upstream ridge) after 1000 m or one sample for each characteristic section (if the length of the section with a track is less than one kilometer) . The selected samples are tested in 4 stages: they are tested for the destroyed core; each core layer is tested in its natural state; testing reshaped samples of asphalt concrete; determine the properties of mixtures and their components.

    Core testing is carried out at the sampling site in a mobile laboratory. If it is not available after visual inspection and marking (sampling location, date of sampling, section, sample and core numbers), the samples are delivered to the laboratory and tested on the day of sampling. If the core could not be taken for the entire depth of the pavement (one or several layers may crumble), it is necessary to collect all the material of the destroyed layer in a separate bag and record the thickness of this layer in the structure (based on the measurement of the layer thickness in the drilled hole).

    The thickness of the layer in the structure is measured using a depth probe. In the process of testing unreformed cores, the thickness of the layers is determined based on the results of measuring the thickness at 3 points with an accuracy of 0.5 mm. The arithmetic mean of three measurements is taken as the layer thickness.

    The cores are divided into separate layers and determine the adhesion strength between the layers and the average density of the pavement layers in the cores

     - average density of the layer in the structure, kg/m 3 ;

    m- mass of the sample in air (weighed to the nearest 0.01 g);

    V- sample volume (determined by hydrostatic weighing or calculated, m 3.

    Then determine the moisture content of the layer in its natural state (with an accuracy of 0.01%) and calculate the water saturation and swelling of the layers. After that, the reshaped samples are tested in accordance with the current regulatory documents.

    The material of each layer of asphalt concrete (one sample of 2 cores) is heated in a thermostat and cylindrical samples are made in accordance with clause 6 GOST 12801-98, during testing of which the average density of asphalt concrete is determined; calculate the compaction coefficient of each layer; determine water saturation and swelling of asphalt concrete, compressive strength at temperatures of +50°C, +20°C and 0°C, tensile strength at splitting, tensile strength in bending and deformability indicators, shear resistance characteristics and water resistance. It is allowed to carry out tests by the accelerated method in accordance with GOST 12801-98, item 21.

    After testing, the reshaped samples are heated in a thermostat to 80°C, converted into a mixture, and the following are determined: the true density of the mixtures by the pycnometric method, the average density of the mineral part, the porosity of the mineral core and residual porosity, the quality of adhesion of the binder to the mineral part of the asphalt concrete mixture.

    The composition of the asphalt concrete mixture is determined and the quality of the constituent components is assessed. To do this, perform the extraction of bitumen from the asphalt mixture. The amount of bitumen in the mixture and the grain composition of the mineral part of the asphalt concrete mixture are determined.

    After the end of extraction (extraction of bitumen from the asphalt mixture), the extract (dissolved bitumen) is dried and the components of the mixture are weighed. At the same time, the following are determined: the content of bitumen in the mixture from the coating with an accuracy of 0.1% and the grain composition of the asphalt concrete mixture after extraction.

    The quality of the bitumen after extraction from the mixture is determined by the following tests: the depth of penetration of the needle according to the method GOST 11501-78*; extensibility according to the method GOST 11505-75*; softening temperature for the ring and ball according to the method GOST 11506-73*; brittleness temperature according to Fraas according to the method GOST 11507-78*; adhesion of bitumen to marble or sand according to the method GOST 11508-74*.

    The quality of crushed stone and sand in the asphalt concrete mixture and structural layers of pavement after extraction is determined in accordance with the requirements of current standards. Compile summary statements of the condition of the pavement and the properties of materials, in which the arithmetic averages of all tested properties are entered.

    Analysis of the state of the layers of the road structure. Analysis of the state of the road structure is carried out in four stages. At the first stage, the analysis of the uniformity of the thickness of each layer within the same alignment at points 1, 2 and 3 is carried out. Changes in the thickness of the layers are noted. A layer in which a spread of properties in one section of more than 10% is noted is considered unstable, subject to plastic deformations. Mark the number of the section and the layer in which unstable properties are marked.

    At the second stage, an analysis of the uniformity of the properties of the unstable layer along the length of the section is carried out. To do this, evaluate the uniformity of properties in samples of the same name (the bottom of the track or the border of the lanes, or the crest of the track riser) along the length of the section. The homogeneity of properties at the same points along the length of the section confirms the revealed instability or allows one to judge the randomness of the result.

    At the third stage, the reasons for the loss of stability of the pavement layers are determined by analyzing the compliance of the properties, pavement layers and their components with the requirements of standards and regulatory documents.

    When analyzing the grain composition of mixtures, changes in the composition of mixtures of one section and deviations in composition from the design values ​​are noted. Layers in which crushed stone crushing is noted, or the quality of materials does not meet the requirements of regulatory documents by more than 5%, are considered weak, in need of strengthening or replacement (full or partial).

    A list of unstable pavement layers is compiled, in which the location of the section on the road, the number of the layer and the properties by which this layer is recognized as unstable are noted. Make a list of the location of areas whose material is not suitable for reuse.

    The final stage of the survey of sections of roads with a track is drawing up a conclusion on the quality of materials in the layers of pavement and their compliance with the requirements of regulatory documents. In conclusion, it is necessary to indicate the places of the track where unstable layers were found, indicate the possible reasons for the loss of stability and the possibility of further operation of the layer in the road structure. It should be noted the possibility of recycling materials of defective layers in pavement and suggest ways to repair a section of the road with a track.

    On the basis of the data obtained in the course of field surveys and laboratory tests, the calculation and forecasting of the possible development of rutting is carried out, the results of which make it possible to justify decisions on the method and methods for eliminating the rut.

    Freezing of the rolled porridge from reagents, snow and ice leads to the formation of ruts. Ice ledges on the road make a serious difference in driving style, which must be taken into account both when slowly driving in yards and when driving on the highway. Consider how dangerous rutting is, as well as how to drive a car in such conditions as safely as possible.

    What is dangerous track

    The main danger of rutting on the roads is manifested when driving at an angle. Under such conditions, different resistance is exerted on the wheels, which results in a powerful rotational impulse. If the speed at such a moment was quite high, the car will immediately go into a skid, trying to turn around its axis. In this case, it is difficult even for experienced drivers to react to a sharp change in the behavior of a car. When driving at high speeds on the highway, it is extremely difficult to adequately react and regain control over the car. Earlier we considered, taking the level of adhesion with the road as a more or less constant value. But in the case of a rutted roadway, the behavior of the car is affected not only by the position of the steering wheel and the operation of the pedals, but also by the changing coefficient of adhesion of the wheels to the road surface.

    As confirmation of our words, we present a video where you can clearly see how the car goes into a skid after trying to cross the track.

    Summer conditions

    In the absence of snow cover, rutting on the road occurs due to the pressure of the wheels on the asphalt mixture. Unfortunately, the quality of the structural layers that make up domestic pavement often leaves much to be desired. Despite the fact that in the summer, rutting is much less dangerous for drivers, you should not neglect caution. At high speeds, crossing the track will lead to the buildup of the car, as a result, to the unloading of the car and a change in the balance of the coefficient of adhesion of the wheels to the road.

    The ruts pose the greatest danger during rain, as the recesses of the pavement fill with water. When entering such a zone at high speed, the wheels do not have time to push through the water layer and touch the hard surface. There is an effect of hydroplaning, in which it is extremely difficult to control the vector of movement of a car, since it is almost impossible to guess the direction when driving away in rainy weather.

    Rut in winter

    Even a novice driver can handle rutting on an icy or snowy road. You just need to follow simple rules:

    How to get out of a rut on the road

    What to do if you need to get out of the rut? To leave, the swing technique is used:

    • slow down to 10-15 km/h. At higher speeds, it is much more difficult to maneuver correctly, in addition, the risk of crossing the car across the roadway increases (the position when the wheels are in the grooves of the track diagonally);
    • direct the steering wheel in the direction opposite to the intended place of departure from the track, at the same time slightly pressing the gas;
    • as soon as the car jumps a little on the wall of the gutter, release the gas and quickly direct the car towards the exit;
    • the resulting impulse will allow the nose of the car to move out of the track, after which you just have to level the car.

    At the time of departure, you should not overdo it with gas, because due to slippage, the wheels will lose traction with the road surface and fall back into a rut.

    Undermining can be used as an alternative option for overcoming rutting. The point is to use a shovel to cut into the icy edge of the gutter, which will allow the wheel to get the grip it needs to get out. If you feel that you have gone too far with speed and you are starting to turn across the road, release the gas pedal and turn the steering wheel in the direction of the skid. At the same time, it is important to catch the moment when the car is almost leveled, so as not to provoke an impulsive skid in the opposite direction.

    The problem of rutting on the road worries the vast majority of motorists, because the formed "rutting" causes accidents, and with quite serious consequences. There is an opinion that the main culprit for the appearance of the track is the motorists themselves, who “shoe” their vehicles in studded tires. But, is this really the case?

    The main reasons for the appearance of a rut

    The track from the spikes is formed in the form of a small narrow strip, but the wider strips formed, most likely appear from a large number of large vehicles and traffic. And, most likely, it is for this reason that “rutting” with hills and depressions appears.

    From everything, one conclusion is drawn that the main reason why the problem of rutting on the road arises is rather not properly carried out road work, as well as the extremely low quality of the coating and material itself. If we pay attention to the technical documentation of the coating, we will find a clear wording that the canvas must be laid in two layers. Moreover, the time period between them should be at least three days. But, as a rule, even one layer cannot be put in good faith on domestic roads. And rarely it meets even the minimum indicators, and according to experts, most roads in Russia are designed for use with a traffic intensity of no more than 500 cars per day.

    NOTE
    In addition, even if they lay asphalt according to the technology, adhering to the norms and order, they do not even let it freeze for a day. Often, traffic is immediately opened along an unformed canvas, from which drops and ruts appear.

    There is another reason, which is hidden in poor-quality repairs. Surely everyone noticed that when repairing a section of the road where there are already depressions, they simply remove the top layer of the canvas, without additional processing and strengthening the base. That is, the problem remains, and it is covered with new asphalt. Of course, this type of "repair" is much cheaper, but, as we see, there is little sense in carrying it out.

    NOTE
    It is not enough to remove the old coating layer, because when used, not only the upper canvas is deformed, but the entire “cushion”. Therefore, it is necessary to build the base again to avoid the appearance of a rut. An interesting fact about the construction of roads in Europe, patching and surface repairs have been prohibited there for quite a long time.

    Therefore, it is clear that the low quality index of the material itself, the improper performance of official duties, becomes the fundamental reason for the appearance of a rut. Of great importance is the role of the workers and managers themselves, because the quality of the work performed will allow the road to remain smooth for many decades. But, still a large percentage of people see spikes as the culprit of the problem, even referring to the experience of their colleagues from Germany.

    NOTE
    Indeed, in Germany since 1975, a ban on the use of any tires with spikes has been introduced, but this is not due to damage to the canvas, but to the large braking distance and inertia of such cars.

    A categorical question arises, is it really possible to completely remake disgusting roads into good ones? Of course, experience shows that all this is real, but local specifics must be taken into account. For example, high traffic congestion, street layout, with long-term repairs form a real collapse. But, at the same time, surface repairs will not give any positive results, the road will shine only for the first year, and maybe much less. Therefore, it is much cheaper to completely block a section of the road and carry out a major overhaul than to carry out patching every year.

    NOTE
    Today officials prefer to choose the lesser negative – bad roads. Summing up, I would like to remind you again that the spikes do not play any role in the destruction and formation of the rut. The fault is not the quality of work and material.

    Methods by which the problem of rutting on the road can be eliminated

    As we have already found out, for a quality repair it is important not only to eliminate the track itself, but also to remove the underlying cause. Therefore, it is important to carry out not only surface repairs, but also carefully revise the “cushion”. Identify shortcomings, determine the level of work and take appropriate measures.

    In companies involved in laying roads, they divide repairs into two main subspecies:

    1. Asphalt repair.
    2. Concrete repair.

    In the first case, the process involves the use of two technologies:

    1. The repair is carried out with the cutting of the road map, that is, such work allows you to completely remove the destroyed and damaged coating, followed by an analysis of the base. If the “cushion” is ready to last another season, then asphalt mixture is poured into the cutouts. The cold type is often used, because hot asphalt is difficult to compact in small sections.
    2. The second type of work already takes into account the absence of a map cut, as such. The technology involves pouring the canvas with a cast mixture. Such a mixture does not even require mandatory compaction.

    In the second case, the use of two technologies is also implied:

    1. In the same way, a part of the canvas, the so-called “card”, is cut out, after which the reinforcement is laid in pre-cut grooves. Before installation, fittings, coating, base are carefully processed and cleaned. After that, only proceed to direct pouring.
    2. Repair without cutting "cards" is carried out using special fillers. That is, the track is cleaned, debris and dust are removed, the surface layer is removed, as a rule, no more than 0.2 mm. Then it is processed with special solutions and emulsions based on cement.

    Rutting Prevention

    In Europe, for example, the main causes of rutting are caused by water ingress with subsequent destruction of the canvas. Of course, in our country there are also sections of roads that are built in accordance with all the rules. Therefore, it would be reasonable to carry out destruction prevention, to save the layer, using a variety of technologies.

    The problem of rutting on the road can be solved with the help of special emulsions that are poured into the formed pores and provide protection against moisture ingress. The disadvantages of this method include only the need to periodically restore the protective layer every two years.

    In addition to the use of various solutions and emulsions, the so-called wear layer is also used. This is a layer of asphalt canvas, consisting of 1 cm of asphalt and 1 cm of crushed stone recessed into the canvas. This coating protects the road from moisture, and also helps to improve traction with the wheels. According to its technical parameters, this type allows you to save the original appearance of the road, but on the condition that initially the work on the arrangement of the roadway was carried out taking into account all the rules and regulations.

    Everything is like in a bearded joke: “ I shaved one leg with a conventional machine, the other with a woodworking machine.”: here is the Bypass, two halves of which are approximately at the same time (autumn-2012 / spring-2013).

    A reasonable question arises: how so? Traditionally, the city administration sees two reasons for the formation of rutting roads: spikes and heavy trucks.

    At the same time, if we consider a specific section of the road, it is logical to assume that the flow of cars with studded tires moving in one direction is approximately equivalent to the flow of cars with studded tires moving in the opposite direction. There is no need to talk about heavy trucks: the Bypass road is dear to them. At the same time, on the one hand there is a track, on the other - no.

    Alexey Bezzub, Rosyama:

    Unfortunately, contractors repair roads in violation of technology, their administration accepts this work, pays for it, the road barely reaches the end of the guarantee. And instead of redoing a frank marriage under a guarantee, they begin to tell us that the thorns and the climate are to blame for everything. Five years ago, the movement "RosYama - Yekaterinburg" was formed, we did not allow asphalt to be laid during the rain, we forced the administration not to pay scammers, as a result, at the same cost, the service life of roads increased several times. One example is bypass. Or another example - Lenin Avenue before March 8th. The road was made in 2012, two years later there were ruts, this section was redone - and for three years now there have been no ruts. Agree that it's not about the spikes?

    At the same time, studs should not be completely discounted: this is not an invention of the Yekaterinburg authorities, studded tires really wear out the roadway more than non-studded ones. The authorities of the EU and neighboring states have long been concerned about this issue and have obliged all tire companies to conduct special tests for all new models: tire prototypes pass through special granite tiles about 400 times at a speed of 100 km / h, in some cases the tiles are additionally moistened to increase wear.

    At the end of the test, the tiles are weighed to determine the degree of abrasion by the studs. If the wear is higher than required, then the manufacturer may be required to work further on the shape and weight of the stud, which will help reduce the load on the blade.